For taller strata buildings, how the painters reach the walls affects the cost, the time on site and how much residents are disrupted. Here’s how rope access (abseiling) and scaffolding compare, and when each makes sense.
Summary at a glance
- Rope access sets up in hours from the roof and keeps entries, balconies and car parks clearer.
- We put scaffold up in stages as the work moves around the building, usually about a day per stage.
- Scaffold suits jobs with heavy repairs, render work or long programs on one face.
- Many buildings use both: rope access for high facades, scaffold or platforms for lower areas.
How do rope access and scaffolding compare?
| Rope access | Scaffolding | |
|---|---|---|
| Set-up | Hours, from the roof | Put up in stages as the work moves, usually about a day per stage |
| Disruption to residents | Low: no frames over balconies or entries | Higher: frames, mesh and restricted access |
| Cost | Often lower on tall, simple facades | Often better value for heavy repair work |
| Best for | Repaints, washing, inspections, spot repairs | Major remedial work, render, long programs |
When is rope access the better choice?
When the building is tall, the work is mainly preparation and painting, and keeping balconies and entries open matters to residents.
When is scaffolding the better choice?
When there’s significant concrete or render repair, or several trades need to work on the same face for weeks.
How we do it
Our own team carries out abseiling and rope access, so the same crew that prepares and paints the lower levels does the high facades. We’ll recommend the access method in the proposal, with the reasons.
Not sure which suits your building?
We’ll assess it on site and explain the options.