A school can’t start term around unfinished work. The holidays are the window, and they go quickly, so the planning has to happen during term. Here’s how we plan school repaints so the buildings are handed back finished, clean and ready for the first day.
Start planning a term ahead
Most school painting happens over the summer break, and that’s when every school wants a painter. If you’re planning a summer repaint, get the scope agreed and the proposals in during Term 3 or early Term 4. That leaves time for the business manager or board to approve it, for colours to be chosen, and for the painter to lock in the crew and materials before the break starts.
Walk the site with the painter, not just the plans
A good proposal comes from a site walk. It shows which areas need full preparation and which only need a refresh, where access is tight, and which buildings might still be in use over the holidays for vacation care, sport or maintenance. Ask for the proposal to be broken down by building or area. That way, if the budget won’t stretch to everything, you can choose what to do now and what to leave for the next break.
Stage the work around who is still on site
Holidays rarely mean an empty school. Office staff, cleaners, other contractors and holiday programs are often there too. We stage the work building by building so the areas that are needed stay open, and we agree the order with the school before we start.
Ask the right safety questions
Before you appoint anyone, check:
- Does every person on site hold a current Working With Children Check?
- Will they provide a site-specific safety plan and SWMS for the work?
- Are they licensed (ours is 118128C) and insured, and do they have a proper WHS system?
- How will they manage ladders, scaffold or elevated work platforms near buildings that are still in use?
Choose coatings that suit a school
Schools take a beating. Corridors, stairwells and classroom walls need hard-wearing, washable finishes. Where staff or holiday programs are in the building, low-VOC, low-odour paints let the rest of the site carry on while the work goes ahead. We use Dulux and Taubmans systems and specify them to suit each area.
Agree a fixed finish date and a handover
The finish date is the one thing that can’t move. Agree it in writing, along with what “finished” means: touch-ups done, furniture back, the site cleaned and a walk-through with the business or facilities manager before the keys are handed back.
Think beyond this break
The schools that spend least over time plan painting as a cycle, not a one-off: a few buildings each year, in order of need. Ask your painter to help map that out. It turns painting from a once-a-decade emergency into a steady line in the maintenance budget.